inner city renewal/reVitalization by Gangtok Municipal

            corporation

               angtok being the capital and the largest town of Sikkim with a population of 1,00,286   The biggest lesson learned during  execution of the initiative are that unless the stakeholders
           G(Census  2011),  had  huge  significance  with  respect  to  administrative  functions,   are  not involved  a  in any project and  people are  not sensitized  about the  purpose  and
            educational centre, a tourist town and hub of trade and commercial practices.  With a major   benefits of the same, it will be extremely difficult to execute the project on time and people
            rural urban migration that led to unplanned growth, the basic amenities and urban services   may not reap the benefits of it.
            were affected to a great extent. Gangtok was also the main tourism hub of Sikkim. So   Remodeling of  MG Marg,  construction  of  Pedestrian  Butterfly  over  bridge at Deorali,
            in order to preserve the serene beauty of the town, efforts were made to improve the   improvement of public footpath at Kazi Road, Gangtok and construction of 12 km public
            existing infrastructure, with the techniques of urban renewal and redevelopment.  footpath along the National Highway, Gangtok are the assets created for the local residents
            A project was taken up by Gangtok Municipal Corporation declaring the Main Business   and  the  tourists  by  Gangtok  Municipal  Corporation.  Inquiries  were  received  about  the
            Centre, MG Marg as a No Vehicular Zone, with the project commencing in June 2007 and   projects from different quarters; however, replication of same varies due to topography and
            completed in December, 2008. M.G. Marg was the main Business Centre that used to be   implementing authority.
            a double lane road and the main township of Gangtok was established along its either
            side. There were problems of congestion, conflict between vehicles and pedestrians, lack of
            adequate space for street parking facilities, encroachment of open spaces and degradation
            in the quality of life with rising air pollution from vehicular emissions. After implementation
            of the project, the traders’ fear of loss of business turned out to be unfounded as the new
            look of the area attracted more people into the market resulting in more business for the
            traders. The rental value of the properties increased many folds after construction of the
            walking mall as the renewed and remodeled infrastructure added new looks to the town,
            which gave a new ambience to the surrounding.
            Gangtok Municipal Corporation also took initiative to construct the bridge which eased the
            problem of the locality at Deorali as people were hit by cars while crossing road and public
            of the locality demanded pedestrian over bridge for safe crossing of the road. The project
            commenced in February, 2012 and was completed in June 2013. The biggest beneficiaries
            of the project were students, common men and the residents of the localities facilitating
            safe walking for public along the National Highway.
            Gangtok Municipal Corporation initiated to remodel and repair public paths at Tibet Road
            and Kazi Road of the city which falls under Tibet Road Municipal ward of the Corporation.
            Considering its importance, the Corporation undertook its repairing and re-modeling.  After revitalisation





























            Image of the city revitalization project before revitalisation