The airport encompasses  an area  of approximately  1300  acres spread  across  four   At present, the solar plants set up in different places, like cargo premises, over car park,
            panchayats and one municipality and about 1.5 lakh people live in these areas.   and over concrete pillars constructed across a canal is generating total 29.5 MW power.
                                                                                  These solar plants have so far saved more than 550MT of〖 CO  emission, contributing to
                                                                                                                                 2
            As an  organization  which successfully  pioneered cost-effective ways  of  building  and   the efforts of CIAL towards minimizing environmental degradation.
            operating  an airport,  CIAL’s  (Cochin  International  Airport  Limited) solar  projects  have
            got larger implications. As the airport operates 24 X 7, the power bill was very high. This
            provoked an alternative thinking. It experimented with a 100 KWp solar power plant in 2013,
            on the roof top of the arrival terminal block and then scaled up the installation capacity to 1
            MWp placed both on the roof and the ground. As the initiative demanded more operational
            focus both in technical and human resources verticals, a special task force was formed
            and put into action.

            The success of these plants prompted up-scaling of operations which led to commissioning
            of the 12MWp capacity solar plant on 18th of August 2015 and  Cochin International Airport
            became the first airport in the world to be fully powered by solar energy. This was set up in
            a land area of 45 acres near the International Cargo premises.  By the end of 2016, the total
            solar capacity of Cochin Airport became 15.5 MWp, capable of generating around 62000
            units of electricity every day. Till date Cochin Airport has produced more than 3.50 crore
            units of solar energy worth approximately Rs. 24 Crores.
                                                                                  Solar Panels installed in parking area
              Year 2015-16

            conStruction of grEEn BuiLDing: Head Quarter of navi Mumbai

            Municipal corporation by navi Mumbai Municipal corporation


               avi Mumbai Municipal Corporation(NMMC) planned to build their Head office at Plot   high performance double glazed panels with recessed windows, façade with dry cladding,
           NNo. 1 & 2, Sector 15A of CBD Belapur, Navi Mumbai with the prime motive of bringing   terrace with  reflective tiles  and low VoC  paints  etc.,  Lighting is  from  the façade  and
            all the departments of NMMC under a single roof, in a central location , easily accessible   occupancy based area lighting, LED lighting, reflective fixtures and also from certain critical
            to people. The project site is spread over 27422 Sq.mt. of area. The building is developed on   area lighting with sensors. Plumbing is with hydro pneumatic water supply system, low
            a barren land. The Plot area initially identified for the project was 20000 Sq.mt. However, the   flow flush, sensor based/push button water taps, rainwater collection and reuse. Moving
            open ground Plot No 2 that lay between the Palm Beach side service road and the Project   Bed Bio Film Reactor (MBBR) technology based sewage treatment and drip flow irrigation
            site was also later developed as part of the Green Foreground for this civic head quarter.   for landscape with native species etc., efficient air conditioning system, and BMS integrated
            No civil construction is carried out in the additional area (plot 2). Building area of the main   services are efficiently functional even after 2 year of occupancy.
            structure is 6700 Sq.mt. and it is a Basement + Ground + 7 storey structure which consists   Record  setting: It  has become a public  attraction spot  in  the city especially on 31st
            of open offices, cabins, meeting rooms, conference rooms, GB meeting Hall, Amphitheatre,   December,  year end,  Republic  Day  and Maharashtra Day.  The main  attractions  are its
            cafeteria, Training Hall etc. A parallel service road has been developed to access the site.   elegant design landscape and light illumination.
            This avoids traffic interference on the heavy traffic Palm Beach Road and Amra Marg. The
            location is well connected by bus routes with local railway stations and other parts of Navi   NMMC, by incorporating these green measures in its own Head office, has set an example
            Mumbai.                                                               for the future projects to be taken up by them or other developing bodies. These could be
                                                                                  termed as guidelines emerging from understanding individual responsibilities towards the
            The Building is planned in a circular form and all major public interface departments occupy   greater good, and a self initiated effort for a Greener Future in Indian cities.
            the ground floor to ensure uninterrupted movement of general public; also to avoid load
            on the lifts. Engineering and administrative departments are planned on second and third   This project has inculcated the habit and culture to excel and produce the International
            floors respectively. The General Body & Mayor, Commissioner Offices are designed under   standard works in the city. Innovation in structural designs in post-tensioned beams and
            the 37m Dome. The Project achievements can be categorized in three paths:   slabs of dome has been recognized even in the Limca Book of records.
            Structural design achievement: The Post Tensioned Beam and Slab structure at fourth   Layout plan of Green Building
            floor level, fifth floor level and the viewing deck level is of a specialized engineering design.
            The  Unsupported  span of 43.21 m in PT beams resting on Column  corbels  and  TFE
            Bearings over the triple height Atrium have been recognized as a World Record for Longest
            PT span in a building by Limca Book of Records. The GRC Dome with 37m dia above the
            central Deck slab is in structural steel and GRC (Glass fiber Reinforced Concrete).
            Green building  features:  The  building design  is with maximum  use of natural  light for
            office area, ventilated atrium planning, cavity wall design with permanent exterior finishes,