Page 50 - HUDCO-BPA21
P. 50
HOUSING, URBAN POVERTY AND INFRASTRUCTURE
been Rs. 91.50 lakhs as Central Share & Rs. 42.17 • After sanctioning of the project, people residing there • With the help of Khadya Gram Udyog and a woman, has been brought under this Self-Help
lakhs as State Share. were explained about the project and the way this will Chhattisgarh State Skill Development Authority Group network. This group serves as a support system
• The overall manpower deployed for design, planning, enhance their livelihood. (CSSDA) a Government handloom business has been to meet their financial and social needs.
execution, and monitoring of the project has been 194 • At first convincing them for making their houses was a setup for them, along with the handloom, for residents To achieve the aim of Pradhan Mantri Awaas Yojana of
personnel, bifurcated as follows: difficult task, as years of ignorance and treatment as who have lost body parts and cannot do laborious providing Housing for All, State Government of
untouchable had created feelings of being neglected in works, Silk & Forest Department has allotted 10 Acres Chhattisgarh took various measures for these neglected
Bifurcation of Personnel of land for Kosa Silk Worm Breeding and according to
their heart. people and provided financial assistance to the urban poor
Sr. Agency Manpower Roles & Responsibilities • However, with motivation, participatory involvement the Collectorate Man-Day Rate the workers are families living in dilapidated and kutcha houses for
No Deployed provided a daily wage of Rs 341 per head. All such construction of a house and also provided land to the
in decision making created a positive atmosphere and
1. ULB 3 Approving authority activities have been taken care of by the Self-Help landless poor along with various other services through
for the works being helped in ice-breaking. Group (SHG) of that area.
implemented, fund • Considering the condition of these families and based convergence of several Central & State sponsored
disbursement, overall on the response and inputs with respect to their basic • At least one member from each household, preferably schemes as mentioned below: -
planning of the activities.
needs, an appropriate design of their houses was made
2. Technical 3 Field coordination, review Convergence of Central & State Sponsored Schemes
Experts & monitoring of work and submitted for approval from ULB.
being carried out. • Toilets for these beneficiaries were constructed
3. Project 3 Preparation of the through Swachh Bharat Mission and layouts of houses Sr. Name of Scheme Service/ Infrastructure Socio-economic Benefits Reduction in
Monitoring DPR, design of the were made such that the toilet comes under or near the No. Provided Beneficiary Share
Consultancy project, monitoring the
implementation activities. house, so that the beneficiaries do not face any issue is 1. Amrut Mission Water Supply, Better health, time saving Rs. 5000 Approx.
using them. Potable Water Tap
4. Construction 185 Construction as per the
Agency approved design and • Electricity connection was provided free of cost to the
specifications. 2. Swachh Bharat Mission Toilet Cleanliness, sanitation Rs. 11000 Approx.
beneficiaries.
194
• These houses were started in a bunch and materials 3. Saubhagya Yojna Electricity Improved quality of life Rs. 1500 Approx.
• For the construction of the houses, materials required required for construction were purchased collectively
were purchased in bulk so that the cost of housing so that the cost of construction gets reduced and the 4. Ujjawala Yojana Gas Connection Better health, time saving,
could be reduced. contribution (beneficiary share) of people of Asha reduced indoor air pollution
• Raw material received after dismantling the rag Nagar becomes negligible. 5. Pushp Vatika Yojana Garden Good environment, clean air,
houses were reused for construction of new houses. • The houses were constructed in pairs so that a common environmental up-gradation
• The houses were constructed in pairs so that a common wall can be used between two units which will again 6. Training Via NULM And Handloom Business Employment, empowerment,
wall can be used between two beneficiaries which reduce the housing cost. Employment in Khadya Gram economic up-gradation
could again reduce the housing cost and hence the • For fresh drinking water, metered waterline Udyog and Chhattisgarh State Skill
beneficiary contribution becomes negligible. connection is proposed through AMRUT Mission, Development Authority (CSSDA)
PROCESS: currently they are provided water connection through 7. Aanganwadi Free Education and Better health, nutrition,
Bhagirathi Nal Jal Yojana.
The process followed for implementation is as follows: - Medicinal Facilities education, improved quality
• Gas connection has been provided to the beneficiaries of life
• As these people did not have any land document of the
through Ujjawala Yojana.
place where they resided since 1984, Municipal 8. Jan Dhan Yojana Bank Account
Corporation Rajnandgaon had decided to first provide • For enhancing the slum condition and upgrading the
them land-ownership document as Aabadi patta for locality, a garden was proposed under Pushp Vatika 9. Pradhan Mantri Jeevan Jyoti Bima Government-Backed Life
land admeasuring 1000 sq ft to each beneficiary with Yojana. Yojana (PMJJBY) Insurance Scheme
the help of Collector. • Ordinary street light was converted into LED lights;
10. Pradhan Mantri Suraksha Bima Government-Backed
• As the process of land document started at the bituminous road construction and for cleanliness, Yojana (PMSBY) Accident Insurance
collectorate level, ULB initiated the process of DPR good quality sewerage system are being implemented Scheme
preparation for state and central sanctioning. by ULB.
{ 36 } { 37 }