Page 72 - HUDCO-DA 21
P. 72

ABD Smart Road Network With Utility Tunnel For Services

          Smart Road Network With Utility Tunnels


          Proposed road network has been classified into categories  such as arterials,  sub-arterials,  Distributor  / collectors
          Roads, Local / Access Roads, and NMT routes with respect to proposed right of way for roads. The Road width of 6m,
          12m, 18m, 24m, 30m and 45 m ROW are developed based on ABD layout and engineering requirements.
          Furthermore, the most important feature are the Underground Utility Corridors running on both sides of the roads for
          infrastructure such as power supply, automated solid waste, water supply & ICT. The Utility Tunnels eradicates the need
          for repeated excavation and reinstatement procedures over its lifetime and therefore eliminates many of the longer-term
          costs relating to sustainability.

          Pedestrians will share these pathways with non-motorized traffic including battery operated vehicles and cycle. Conflict
          free Pedestrian Ways are achieved through following means: Conflict free junctions, Vehicle free zones, Skywalk connecting
          buildings, Grade separation, Pedestrian and cyclist friendly street.









                           AREA BASED DEVELOPMENT AT NORTH & SOUTH T.T. NAGAR, BHOPAL.

           54
   67   68   69   70   71   72   73   74   75   76   77