Phase III – Internal repair works (contd…)


          The wall on the South - west side of 2nd floor
          had wide cracks due to vegetation  growth.
          After removing the vegetation, the cracks were
          grouted and concreted.  The corner  cracks  in
          the walls were stitched with in-situ lintels and
          plastered over.

          The severely damaged column on the 5th floor
          were strengthened  as per structural engineer’s
          advice. The worn out concrete, rusted steel           Fig. 47 Stitching of Wall  Fig. 48 & 49 Repairing  of Encased  Columns
          sections  were removed carefully,  column  was        Cracks
          newly encased  and  concreted.  The I-sections
          at various locations  like door-window lintels
          etc which were found rusted were repaired and
          strengthened by adding new MS plates welded
          on the rusted section  and industrial  primer
          applied over it.

          Common area refurbishment

          The hexagonal  encaustic  tiles  were missing/
          damaged/ defaced in common areas like lobby,
          staircase, and landing. These were replaced and       Fig. 50                  Fig. 51                 Fig. 52
          fixed in matching pattern of the existing ones
          but in cement tiles. The teakwood staircase
          has some loose treads and riser which  were
          repaired. The TW balustrade and the MS railing
          were also cleaned and painted. Loose plaster
          patches in the common areas were re-plastered
          and complete painting was carried out.
          The laminate cladded doors were standardized
          to original teakwood polished. The timber runner
          members  were shown and highlighted. Doors
          were polished. Electrical  works were taken in
          cable tray and uniform lights were added.
                                                                Fig. 53                  Fig. 54                 Fig. 55