CASE STUDY


              Households (HHs), providing     agencies provided their offer   Management Project has been
              service    for   composting,    is above the base price fixed   formed.
              including         community     by CKC.
              composting and management                                       D.        The         Project
              of    Material     Collection   C.  Scientific  advancement     Implementation       Manual
              Facility  (MCF)  and  resource   through KSWMP                  (PIM)
              recovery  facility  (RRF).  The   The  total   solid   waste    The    objective    of    the
              HKS  members  are  provided     generation   in   Kerala   is   PIM    is   to   detail   the
              with    personal   protection   estimated  at  3.7  million     operational      mechanisms
              equipment  (PPE)  Kits  and     tons  annually.  Of  the  total   and        implementation
              are empowered to collect a      waste  generated,  the  total   arrangements  for the Project
              set  user-fee  from  HHs  and   share    of    biodegradable    to provide detailed guidance
              institutions  for  bio  and  non-  and    non-biodegradable     for Local Self Government
              biodegradable waste.            waste  (NBDW)  is  at  69%      Department           (LSGD),
                                              and  31  %  respectively.  The   Suchitwa  Mission,  the  PMU,
              The process involves primary    biodegradable  waste  (BDW)     and the participating ULBs in
              segregation of waste using      has a moisture content of       executing  and  implementing
              two-bin approach for bio-       about 70%. It is estimated that   various components of the
              degradable    waste   (BDW)     only 20% of the BDW is treated   Project.   It   describes   the
              and    non-bio    degradable    at household or community       implementation      processes
              waste  (NBDW)  at  source.      levels, and the remaining 80%
              As  regards  bio-waste,  bio-   is not properly treated and     and provides the technical
                                                                              guidelines,
                                                                                                operational
              bins  at  households’  level,   disposed.  Similarly,  about
              composting at the community     60% of the NBDW is dumped       procedures and reporting
                                                                              requirements.  As  this  is  an
              level through Thumburmuzhi      illegally or burned, while the
              (TM),     window,       other   remaining waste is collected    operational  document  for
                                                                              the  Project,  the  PIM  can  be
              aerobic    processes    have    informally  by  rag-pickers.
              been instrumental in a de-      A minor fraction is recycled    revised  during  the  Project,
              centralised  mode.  Similarly,   at  the  community  level.  The   with the approval of the
              segregated NBDW is collected    State has no engineered         concerned    authorities   to
              at prescribed interval of time   landfills  and/or  centralised   provide for any additional
                                                                              requirements/changes
                                                                                                       that
              (as per HKS calendar) and is    waste  management  facilities
              brought to the mini MCF and     for     municipal      waste.   may be necessitated during
                                                                              the project implementation
              further separation of bio and   Consequently,     a    major
              non-bio waste which is then     proportion    of   municipal    period.  There  is  a  separate
              taken to MCF and for RRF        waste is openly dumped in       PIM for procurement of goods
              for recovery of waste leaving   public spaces, low-lying lands   and equipments  that are
              aside  reusable  waste. A  total   and water bodies, resulting in   expected to be purchased by
              of more than 1,100 Mini MCFs    creation of numerous illegal    ULBs based on a SWM plan.
              have been established across    open dumpsites that pose        Part  –  II – KSWMP’s
              the  state.  The  ULBs  have    serious   environment    and    SWM intervention in the
              entered into an agreement       public  health  hazards.  In    financial capital of Kerala,
              with  Clean  Kerala  Company    order to address these issues,
              (CKC) to collect the materials   a scientific approach has been   the Kochi city
              from RRF. ULBs can enter into   adopted and a specialised       A: Brief Introduction of
              an agreement with private       Institution Kerala Solid Waste   Kochi the city


                                                              April, 2025, Volume 26. No.1 - SHELTER    55