CASE STUDIES
Figure 3: Proposed Citywide Solutions SOLUTION 02:
REL OCA TING
KANDALGAO TO
TENABLE SLUM
According to the Development
Plan(DP), Kandalgao had
multiple reservations in
different parts of the slum
such as open space, public -
semi public, road widening.
As a result the slum was
completely untenable and
would soon have to relocate
to an alternative plot of land.
Process of proposing
solutions for Kandalgao:
A 2km radius around
Kandalgao was marked and
slums within the area were
noted. The dwelling densities
and extra housing stock
potential for each slum was
noted. The slums that were
potential receiving pockets
were identified on the basis
of parameters such as (1)
Dwelling Densities and extra
housing stock (2) reservation
(3) on-ground complexities
Development of Vare Vasahat
as a receiving pocket to absorb
Kandalgao:
Kandalgao a slum located in
SOLUTION 01: KAMGAR and the residents suffered Administrative Ward 03, had a
CHAWL : IN-SITU from poor sanitation facilities, vulnerability index of 22. The
REHABILITATION: unhygienic living conditions, slum was under P-SP, Open
narrow roads, inadequate Space and road widening
Kamgar Chawl, a slum located parking, etc. The slum was reservation. The slum being
in Administrative Ward 02, identified for in-situ holistic untenable, the residents
had a dwelling density of 431 redevelopment that would would have to relocate in near
dwelling units / hectare. The ensure a well-planned future. Informal discussions
slum occupied an area that mid-rise high density were undertaken with a
had inadequate infrastructure redevelopment. few community members