CASE STUDIES


              Figure 3:   Proposed Citywide Solutions                         SOLUTION                  02:
                                                                              REL OCA TING
                                                                              KANDALGAO                TO
                                                                              TENABLE SLUM

                                                                              According to the Development
                                                                              Plan(DP),   Kandalgao  had
                                                                              multiple    reservations   in
                                                                              different parts of the slum
                                                                              such as open space, public -
                                                                              semi public, road widening.
                                                                              As a result the slum was
                                                                              completely untenable and
                                                                              would soon have to relocate
                                                                              to an alternative plot of land.

                                                                              Process     of    proposing
                                                                              solutions for Kandalgao:

                                                                              A    2km    radius    around
                                                                              Kandalgao was marked and
                                                                              slums within the area were
                                                                              noted.  The dwelling densities
                                                                              and extra housing  stock
                                                                              potential  for  each  slum  was
                                                                              noted.  The slums that were
                                                                              potential receiving pockets
                                                                              were identified on the basis
                                                                              of  parameters  such  as  (1)
                                                                              Dwelling Densities and extra
                                                                              housing stock (2) reservation
                                                                              (3) on-ground complexities
                                                                              Development of Vare Vasahat
                                                                              as a receiving pocket to absorb
                                                                              Kandalgao:
                                                                              Kandalgao a slum located in
              SOLUTION 01:  KAMGAR            and the residents suffered      Administrative Ward 03, had a
              CHAWL         :    IN-SITU      from poor sanitation facilities,   vulnerability index of 22.  The
              REHABILITATION:                 unhygienic living conditions,   slum  was  under  P-SP,  Open
                                              narrow roads,  inadequate       Space and road widening
              Kamgar Chawl, a slum located    parking, etc.  The slum was     reservation.  The slum being
              in  Administrative Ward 02,     identified  for in-situ holistic   untenable,  the  residents
              had a dwelling density of 431   redevelopment that would        would have to relocate in near
              dwelling units / hectare.  The   ensure    a    well-planned    future.  Informal discussions
              slum  occupied  an  area  that   mid-rise    high     density   were undertaken with a
              had inadequate infrastructure   redevelopment.                  few community members