CASE STUDIES

          •  They  prepare  the  detailed    2.  High slum population and land   3.  Land     for       Transit
             architectural and  structural     coverage: Growing populations      Accommodations – Use of
             drawings     including    the     and urban migration have           Alternate vacant land for
             project      implementation       resulted  in occupation  of        transit accommodation by
             framework  and  also  manage      large  percentages of the  city    developer is not financially
             the finances through its own      by squatter settlements.           viable, however an alternative
             funds  or  arranging funds  by   3.  Real Estate Cost: The land      government land for transit
             foreign direct investments        transferred     from      the      accommodation  on rent is a
             or domestic funds through         government to the developers       more viable (on the lines of
             international lenders.            replaces  the need for  a          DMRC Projects).
          •  The  developer  also  assists     government subsidy; in fact,    4.  FAR –Project should be treated
             the beneficiaries in forming      the government gains from          as  one entity and  Unused
             an association  / RWA of the      the 25% premium paid by            FAR from Rehabilitation part
             beneficiaries for the  purpose    developers and leverages the       should be allowed to be used
             of operation and maintenance      capacity and expertise of the      in remunerative component,
             for a period of 5 years.          private sector  in real estate     and incentive of 1.5*FAR in
          •  The  sale  of  remunerative       development.                       remunerative      component
             components by the developer     However, a major  challenge          should be given as it’s a
             will only be possible after the   faced by  developer are as         redevelopment project.
             completion  and  handover       follows.                          5.  Density  -900  DU  per Ha.  is
             of   the   completed    EWS     1.  Slum   Clearance   –    The      insufficient  to  accommodate
             residential components to         developer does not want            population in some  slum
             DDA.                              to get involved in slum            pockets, hence it  requires
          •  The      developer      shall     clearance and government           relaxation.
             mandatorily provide all the       intervention is sought to       CASE STUDY
             basic amenities/infrastructure    be suitable. Vacation of Site
             (water, electricity, sanitation   should  be done  by DDA  in     About 14 JJ (Jhuggi  Jhopri)
             facilities)   under       the     line with Kathputli colony      clusters  covered in 7 projects
             rehabilitation scheme besides     development and  vacant site    having approximately 20677
             providing houses to the           should be provided to the       households are being  taken
             beneficiaries.                    developer                       up across Delhi in Phase
          Factors imperative to make in-     2.  EWS  Component handover-      1   of   redevelopment.     This
          situ redevelopment successful -      Developer should be allowed     paper analyses a case from
                                                                               the perspective of providing
          Following are the main attributes    to take up construction         affordable housing to urban
          of   the   slum    rehabilitation    of     rehabilitation     and   poor under In Situ Slum
          model which enable in-situ           remunerative      component     Rehabilitation PMAY (U) in
          redevelopment scheme  to  work       simultaneously,    sales   of   slums  of Shalimar Bagh and
          well:                                remunerative      component     Pitampura in Delhi. The study
                                               can  be allowed,  however
          1.  Land Scarcity: Land scarcity in   possession should be allowed   of slum has been conducted at
             the strategic locations near to   only after  handover of EWS     settlement level and dwelling
             major economic centres.           component.                      unit level and highlights the
                                                                               current situation of  slum  and