SANITATION
          SANIT   A TION


         UTILIZATION OF MANGALURU CITY                                                                                         MOBILISATION OF RESOURCES:                            Ÿ The  MSTPL  to  approve  manpower,  each  activity,
                                                                                                                                                                                        budget, and schedule, the appointment of consultants
         SEWAGE WASTEWATER FOR                                                                                                 With the aid of the Asian Development Bank, MCC took     and experts
                                                                                                                               up the development of wastewater management system
         INDUSTRIAL PURPOSE                                                                                                    (sewerage system) in Mangaluru city.                  Ÿ To  check  the  O&M  contractor  performance  and
                                                                                                                                                                                        certification for payment as per TOR between O&M
                                                                                                                               PROCESS:
          - by Mangaluru City Corporation, Karnataka                                                                                                                                    Contractor and SPV
                                                                                                                               Initiatives and Implementation Strategies are as below:
                                                                                                                                                                                     Ÿ Release  of  Payments  to  the  O&M  Contractor  &
                                                                                                                               Ÿ Mangalore City Corporation passed a resolution for     Employees/agencies after Board Approval
                                                                                                                                  forming SPV on 29th January 2007
                                                                                                                                                                                     Ÿ MCC to provide necessary land free of cost within
                   angaluru is the second-largest city in Karnataka in terms of economy. Mangaluru's economy is                Ÿ Memorandum  of  Agreement  entered  between            STP Premises for setting up infrastructure required for
                   dominated by the industrial, commercial, agricultural processing and port-related activities. It is one of     Mangalore SEZ Ltd and Mangalore City Corporation      MSEZL
          Mthe largest SEZs in India. MCC took up the development of wastewater management system (sewerage                       on 10th January 2008
                                                                                                                                                                                     Ÿ MSEZL to lift the water free of charges.
          system) in Mangaluru city for reduction in the dependency on natural water resources and financial burden on
                                                                                                                               Ÿ Government  of  Karnataka  approval  received  vide
          Mangalore City Corporation (MCC) for operation and maintenance of sewage treatment plant. The project has                                                                  Various Parameters
                                                                                                                                  letter dated 11th March 2008
          helped in avoiding disposal of secondary treated sewage in natural river body thereby minimization of pollution
                                                                                                                                                                                                                            STP Outlet
                                                                                                                                                                                                                  STP Inlet
          loads on freshwater sources and improving environmental quality besides generation of employment.                    Ÿ Company Secretary  appointed for formation of SPV    Parameter      Tolerance   Parameter   Parameter/
                                                                                                                                                                                                       Limit
                                                                                                                                  on 16th February 2009
                                                                                                                                                                                                                            Inlet to TTP
                                                                                                                               Ÿ Incorporation of the SPV (Mangalore STP limited) by   pH          7.0 to 7.5      6.0 to 6.8   6.5 to 7.5
         BACKGROUND:                                           KEY DATES:
                                                                                                                                  the company secretary on 24.03.2011                 BOD at 20 ̊c   Not more than   150-200    16 to 20
         Mangaluru is the chief port city of the Karnataka state   DATES        Significance/Achievement                                                                                            20mg/L
                                                                                                                               Ÿ Operation  and  Maintenance  of  three  Sewage
         located about 352 kms (220 mi) west of the state capital,   29th January 2007   Mangalore City Corporation passed a      Treatment Plants (Kavoor, Surathkal and Bajal) and   COD         Not more than    400-450      75-100
                                                                                resolution for forming SPV                                                                                         100mg/L
         Bengaluru between the Arabian Sea and the Western Ghat                                                                   connected  wet  wells/  Pumping  stations  from  Wet
                                                               10th January 2008   Memorandum of Agreement was entered                                                                Total        Not more than    150-250         30
         mountain ranges. It is the administrative headquarters of                                                                wells to STP) in Mangaluru
                                                                                between Mangalore SEZ Ltd and Man-                                                                    Suspended    30mg/L
         the Dakshina Kannada district. Its status of being the only            galore City Corporation (MCC)                                                                         Solids
                                                                                                                               Ÿ Cost Sharing of O&M by MSEZL and MCC by the
         city in the state to be accessible via all forms of transport -   11th March 2008   Received approval from Government of   ratio of 70:30                                    Total        Less than 5         6 - 7        6-7
         air,  road,  rail  and  sea  makes  it  a  unique  location  for       Karnataka                                                                                             Phosphate    mg/L
         commercial  investments  and  activities.  Today,  the   16th February 2009  Appointed Company Secretary for for-     Ÿ Shareholding by MSEZL and MCC to be in the ratio of   Total       Less than          25-30       23-25
                                                                                mation of SPV
         Mangaluru region is a nationally known higher education                                                                  70:30                                               Nitrogen     50mg/L
                                                               24th March 2011   Incorporation of the SPV (Mangalore
         hub  with  a  flourishing  service  sector,  particularly  in
                                                                                STP limited) done by the Company               Ÿ Authorized share Capital shall be Rs. 5 lakhs       The broad development is as follows:
         medical services, a small but growing IT regional hub,                 Secretary
         and a booming real estate and banking industry.       2013             Commissioning of the Tertiary Treatment        Ÿ Total 5 directors for SPV                           Ÿ Development of 4 STPs :
                                                                                Plant                                                                                                   -  Kavoor (43.5 MLD/9.5 MGD)
         Ÿ Mangaluru City Corporation had a facility of 154 km                                                                 Ÿ Chairman and Managing Director to be from MSEZL
            stretch old underground drainage network throughout   ESTABLISHMENT OF PRIORITIES:                                    and other two directors each from MSEZL and MCC       -  Bajal (20 MLD/4.40 MGD)
            the city for a collection of sewage wastewater from all   Ÿ Reduction  in  the  dependency  on  natural  water     Ÿ SPV  shall  be  responsible  for  selecting  the  O&M   -  Surathkal (16.5 MLD/3.63 MGD)
            the commercial and residential areas.                 resources                                                       contractor                                            -  Pachanady (8.75 MLD/1.92 MGD)
                                                               Ÿ Reduction  of  financial  burden  on  Mangalore  City
         Ÿ Mangaluru  City  Corporation  had  provided  with  2                                                                Ÿ O&M Fund to be created. Initial contribution in the   Ÿ 22 Nos. of wet wells
                                                                  Corporation for O&M of STP
            numbers  of  Sewage  Treatment  Plant  which  was                                                                     ratio of 70:30                                     Ÿ 363  Km  development  of  trunk  mains  &  UGD
                                                               Ÿ Avoiding  disposal  of  secondary  treated  sewage  in
            covered only for the main city area and the remaining                                                                                                                       collection network.
                                                                  natural river body thereby minimization of pollution         Ÿ Subsequent years, the amount on contribution would
            area was let out to the drain.                                                                                                                                              ·  The system was designed in such a way that the
                                                                  loads  on  freshwater  sources  &  improving                    be  worked  out  by  December  1st  of  the  preceding   treated effluent to be discharged into nallah which
         Ÿ There was no treatment for the sewage water collected   environmental quality                                          financial year and contribution to be made by 1st Week
                                                                                                                                                                                          leads to sea at 20 BOD & 30 TSS.
            on the outskirts of Mangaluru City limits.         Ÿ Employment generation                                            of April