The treated sewage water after disinfection is stored in the spend the following expenditure on O&M for WASTE TO ENERGY PLANT
final storage tank and then it will be pumped to MRPL & wastewater management system per annum:
MSEZL units (through 13.3KM DI Pipeline).
Ÿ The same is updated to revised rates which come to Rs - by Jabalpur Municipal Corporation, Madhya Pradesh
he project incorporates a highly proven concept for generation of electricity from MSW which allows
efficient power generation, efficient waste disposal and low environmental impact. Jabalpur Municipal
TCorporation had leased out the land for development of project at nominal lease rent for the period of 20
years and PPA agreement between Essel Jabalpur MSW Pvt. Ltd and Madhya Pradesh Power Management
Company Ltd. was executed. Plant has been running successfully since 16th May 2016 and processing
approximately 600 Tons of Municipal Solids old and fresh waste of Jabalpur daily.
BACKGROUND & ESTABLISHMENT OF project at nominal lease rent for the period of 20 years.
PRIORITIES:
Quantity of treated water pumped to MSEZ since 2013 till August 2019 Present and proposed landuse pattern for TTP with existing STP Kavoor Ÿ The concession was granted for collection and
Towards efficient waste disposal, a smart waste to energy transport of waste for a term of ten years.
RESULTS ACHIEVED: 16.00 crores per annum plant was set up in Jabalpur with 600 TPD, MSW
Ÿ The Tipping fee of C&T of waste is 1620.68/ M.T.
Coverage of the targeted population O&M UGD scheme Rs . 8.37 crores per annum disposal incinerator and 11.5 MW turbine Generator
The project has covered entire Mangaluru City O&M of STPs Rs4.50 crores per annum having a technology that has no requirement of waste KEY DATES:
Corporation area of 132.45 Sq km consisting of 60 wards Total Rs. 12.87 crores per annum segregation for disposal. The Technology adopted for this DATES Significance/Achievement
and having a population of 4,99,489 (as per 2011 Census). project is Hitachi Zosen INOVA controlled combustion 11th May-2016 Plant synchronized with grid (MPPCTL)
TRANSFERABILITY technology for mixed MSW. Hitachi Zosen grate
Cost-effectiveness of the project after successful erection & commissioning
Initiative taken by MCC for the development of combustion system has 80 years excellent environmental
Ÿ The total cost of development is Rs. 21680 crores. Out 12th April-2018 Golden Peacock Award: Rank 2nd Best
wastewater management system in Mangaluru city for track record. The technology has been adopted is in Project in the integrated MSW to Energy
of which Rs.16620 crores is a loan from ADB and Rs.
reduction in the dependency on natural water resources compliance with MSW rules and the most modern flue Category in India
5060 crores is a grant from Government of Karnataka.
and financial burden for operation and maintenance of gas cleaning technologies. The furnace temperature is in
Ÿ The entire system was developed by KUDCEM and to sewage treatment plant can be replicated in other parts of excess of 850°C with 2 second residence time. Swirl PROCESS:
be handed over to Mangalore City Corporation for the country. It is expected that the future projects will help stabilized secondary combustion and tangential Waste-to-Energy (WTE) uses trash as a fuel for
Operation & Maintenance. in avoiding disposal of secondary treated sewage and
secondary air injection for optimized burnout of flue gas generating power based on the 'mass burning concept' and
Ÿ As estimated by KUDCEM in the year 2011, MCC to minimize pollution loads and improve environmental has been provided. The technology complies with present all kinds of municipal waste. Trash is the fuel for this plant
quality.
SWM rules-2016. just like conventional power plants use coal, oil, or natural
gas. The burning fuel heats water into steam that drives a
Salient features are:
turbine to create electricity. The process reduces a
Ÿ The PPA agreement between Essel Jabalpur MSW community's landfill volume by up to 90 percent, and
Pvt. Ltd and Madhya Pradesh Power management prevent one ton of carbon dioxide released for every ton
company Ltd. was executed of waste burned.
Ÿ Tariff as per the MPERC tariff order dated 1/10/2013 is Generating electricity in a waste-to-energy plant
Rs. 6.39/KWH for the project life of 20 years. encompasses five steps:
Ÿ JMC had leased out the land for the development of the Ÿ Garbage trucks dump the waste into a pit.
Expansion of Tertiary Treatment Plant (5MGD)