Page 168 - HUDCO DESIGN AWARDS 2023-24
P. 168

MASTER PLAN, DESIGNED FOR
            SUSTAINABILITY AND COMMUNITY


            •  The client brief was simple-To design a
               Campus on a 17 acres site for processing
               of 750 MT/day Municipal Solid Waste
               (MSW) while producing 7.5 MW of clean
               Energy. The design team enhanced upon
               this to include:
            •  Spreading Awareness in Society on MSW
               & Related Problems
            •  Showcase how  Industries can build and
               operate in a more responsible way leading
               to Net Zero Development
            •  Inclusive Design Process
            •  Design with Community in mind

            Efficient design resulted in utilization of only
            20% of the site area for the plant and related
            functions, allowing  the maximum amount of      LEGEND
            land for greens, community activities  and      1.     Visitor’s Entrance
            future expansion. The plant (process flow) is   2.     Neem Van
            oriented in such a way that incoming city waste   3.   Cafeteria
            has direct access to the plant, & byproducts    4.     Multipurpose Sports Field / Open Lawn area
            can be efficiently moved to the adjacent areas   5.    Lotus Pond
            & bio-gas plant, optimising  process  flow &    6.     Waste to energy-Art Wall
            transportation.                                 7.     Bio-gas Plant area
                                                            8.     Staff entrance
            The master plan incorporates an onsite Solar    9.     Solar energy Plant
            PV with a capacity of 7.5 kW to meet 100%       10.    Cold Storage Value chain (Future Expansion)
            of the electrical needs and reduces reliance    11.    Outdoor composting operations area
            on conventional forms of energy.                12.    Water Value chain (Future Expansion)
            A pipeline, over 1 km long, is installed to     13.    Kalp Vruksh Vatika
            source majority of process water requirement    14.    High tech farming Tower (Future Expansion)
            for  cooling  towers  of  the advanced Mist     15.    Mist cooling pond
            Turbine Condenser from treated municipal        16.    Pump house
            water, relieving  pressure  on freshwater       17.    Admin Building
            sources. Additionally, a rainwater harvesting   18.    Turbine + Condensor
            system captures 100% of runoff volumes          19.    Main Plant
            through 10 recharge wells, promoting water      20.    Pre-Processing Unit
            conservation.                                   21.    Temple

                                                            Masterplan

                WASTE TO ENERGY (WTE) CAMPUS AT JAMNAGAR,  GUJARAT