THEME PAPER


         Precast Concrete Construction:  elements viz. walls, beams, slabs,  Pre-Engineered Metal Buildings
         It is also addressed as PCCons. It  columns, may be reinforced,  -  These  are  the  buildings/
         is  a  construction  product  prestressed  or post-tensioned  as  systems/ members engineered
         produced by casting concrete in  required for application. The  (with built-up sections) at a
         a reusable mold or "form," which  SRA  Scheme  at  Bhoiwada,  factory  to  the  exact  size,
         is then cured in a controlled  Mumbai,  is  a  residential  transported and lifted, installed,
         environment (a factory or a  building - with 2500 apartments.  and assembled at site.(Figure 7)
         manufacturing unit or precast  The Slum Rehab Project has  PEBs are steel structures.¹⁰ The
         yard on site), transported  to the  G+23 floors with 6 Blocks with  sections used can be cold-rolled
         construction site/ area and lifted,  Load Bearing Precast Walls,  sections or hot-rolled sections.
         installed and assembled into  Precast Solid Slabs, Precast WC  CPWD is constructing two pre-
         place.⁹  The  various  precast  & Bath Pods. (Figure 6)              engineered buildings on Africa
                                                                              Avenue and KG Marg, New
               Figure 7: pre-engineered office complex for Ministry of Defense,   Delhi,  for  the  Ministry  of
                             Africa Avenue, Source: Author                    Defense's office complexes with
                                                                              a combined built-up area of
                                                                              92000 square meters in 1/3rd of
                                                                              the construction time taken by
                                                                              conventional      construction
                                                                              technologies. The light gauge
                                                                              steel members of the framed
                                                                              structure are being joined with
                                                                              nuts and bolts, drywall using
                                                                              LGSS and cement fiber boards in
                                                                              the external and gypsum boards
                                                                              in the internal wall faces, and
                                                                              rock wool for insulation which
                                                                              has led to water saving since
                                                                              plaster  and  curing  is  not
                                                                              required.  The  prefabricated
                                                                              building components are being
                                                                              sourced from factories in Indore,
                                                                              Bawal, and Palwal.

                                                                              3D Volumetric Construction is
                                                                              the  production  of  three-
                                                                              dimensional modular units in
                                                                              controlled factory conditions,





                                                                          April 2021 Volume 22 No. 1- SHELTER  35