Page 24 - HUDCO-BPA21
P. 24

URBAN GOVERNANCE



         In summation, the following steps were followed:     2.  Damaged  Mussavi  Drawings  :  Since  many  of  the
                                                              Village maps were old and damaged, many of the khasra
          Ÿ Step 1: Digitization of Archive Cadastral Maps (2
                                                              numbers were not found in the Mussavi and Sajra Plans.
             months)
                                                              Many  of  the  Urban  Numbers  were  also  repeated
          Ÿ Step 2: Data Validation (8 months)                in  the  Sajra  Plans.  Such  areas  proved  difficult  for

          Ÿ Step 3: Digitization + geo-referencing (9 months)   digitization.
          Ÿ Step 4: Coding + testing for GIS data correction and   3. The digitization and the linking of the tax data attributes
             property tax software (2 years)                  with the building footprints, required special skill and
          Ÿ Step 5: Testing of the software and hands-on training   manpower for such a large data.
             to the employees of MCR                                                                                            Parks and Roads of Municipal Corporation
                                                              RESULT ACHIEVED:
         The total project cost for the above-mentioned steps was
         about Rs. 80 lacs. This was budgeted from MCR revenue   The initiative has achieved the following successes for
         itself and the State government was not directly involved   the Municipal Corporation Rohtak as well as the Town.
         in the process.
                                                              I.  Centralized  Database  of  multiple  layers  of
         CHALLENGES                                           information:

         1.  Digitization  of  Archive  Data:  Cadastral  Maps   The current GIS database has 30 layers of information
         (Mussavis) of villages was produced from the Municipal   that include Lal Dora, 1954 Old Town Boundary, 2001
         Corporation  of  Rohtak.  The  process  of  digitization   Municipal  Council  Boundary,  Municipal  Corporation
         involved  generating  the  Murrabas  and  Kilas  using   Boundary, Controlled Area Boundary, Ward Boundary ,
         dimensions  for  each  Mussvi. All  internal  features  and   Town  Planning  Scheme  Boundary,  Rehabilitation        Detailed Information of Community Centre with    Detailed Information of Roads with UID Number Khasra Number
         village boundaries were digitized using the dimensions   Colonies  Boundary,  Industrial  Colonies  Boundary,
         mentioned in the Mussavi. Each map was digitized for   Colonies  related  other  Departments  Boundary,  2004          II. Property Tax Collection:                          III. Efficient planning and decision making:
         providing the Murabba grid and number, Killa grid and
                                                              Approved Colonies Boundary, 2013 Approved Colonies                Mapping  of  individual  properties  and  their  integration   The  preparation  of  master  plans  has  become  easier.
         number, roads, canals etc. using ArcGIS. This has ensured
                                                              Boundary,  All  MC  Area  Colonies  Boundary,  HUDA               with the property tax system, along with availability of   Approximately 1.79 lacs properties are linked spatially to
         that  the  digitized  Mussavi  is  an  exact  replica  of  the
                                                              Sectors  Boundary,  Improvement  Trust  Colonies                  information  like  owner  name,  usage,  property  type,   the data including the name of the owner, plot area etc.
         existing map. The topology of the digitized features was
                                                              Boundary, MC Land with Killa/Khasra Number, Parks,                assessment  value,  outstanding  tax  amount  etc.  has   Utility layers like sewage networks have also been added
         built such that the attributes of the spatial features could
                                                              Major Locations, Canal Network, Drain Network, Roads,             improved  the  property  tax  recovery.  One  of  the  key   and  can  be  used  to  plan  future  projects  in  a  better-
         be linked. The conversion of hard copy maps to digital
                                                              Railway Line                                                      factors is the GIS-based property tax monitoring and the   informed manner.
         forms and linking the data was a time-consuming process.
                                                                                                                                easy  availability  of  information  on  pending  recovery
                                                                                                                                amounts.  The  property  recovery  has  risen  from  Rs.  7
                                                                                                                                crores to 32 crores in a period of 4 years.

















         Digitization of Mussavi data using existing grids  Damaged Maps
                                                                                                                                                                                     Water Pipe Line and Boosting Station Location
                                                                                                                                Property Details with unique id and details of owner
                                                          { 10 }                                                                                                                 { 11 }
   19   20   21   22   23   24   25   26   27   28   29