HOUSING, URBAN POVERTY AND INFRASTRUCTURE
open air theater and green cover to the layout· three commercial complexes. After completion of the Many Government departments have come forward to
Site was designed scientifically with non- project, the houses are allotted in the name of female provide supporting infrastructure to the housing colony
monotonous blocks spouse as per the Aadhar cards and below poverty line for people who could not afford their own houses. Some
(BPL) cards of Economic Weaker sections (EWS) of the of the infrastructure facilities and departments providing
Ÿ Work was carried out 24/7 with electronic
society. them are shown below:
surveillance and without any compromise in
quality
Physical Infrastructure:
Ÿ Environment-friendly construction practices were
taken up minimizing carbon footprint S.No. Name of the Department Infrastructure facilities provided
Ÿ Physical and Social Infrastructure were provided as 1 TSSPDCL Electric supply to 2 BHK Housing colonies
per URDPFI standards
2 HMWS & SB Protected water supply under “Urban Mission Bagiratha” Sewerage disposal
Ÿ Efficient architectural design was done to provide
connectivity to city sewer network
maximum ventilation and duly following the Vastu
Shastra for upholding the sentiments of EWS 3 TSRTC Bus stations / bus stops and integrating with existing TSRTC network
people. The Kollur II project is a blend of ancient
4 IT, E & C Department Internet connectivity through T fiber grid network and MeeSeva Centers
and modern architectural sciences resulting in the
best utilization of the space
5 Disaster Response & Fire Services Fire stations
Ÿ Integration of services with other departments was Department.
Location of 2 BHK Colony in GHMC
done to cater to all the needs of the beneficiaries
6 Sports Authority of Telangana State Sport facilities / open air gymnasium / sports complexes
Ÿ Commercial spaces are incorporated in the layout
for making the operation and maintenance aspect of 7 SLBC - State Bank of India Banks / ATMs
the Housing project a self-sustainable one.
8 Commissioner of Police, Hyderabad/ Police stations / police outposts, installation of CC cameras
PROCESS: Cyberabad/ Rachakonda.
The GHMC was entrusted with the task of preparing
9 TSMDC Supply of sand
strategies for meeting the housing demand. GHMC
invited proposals for development of a Housing colony
with a deep understanding of technologies to complete
Before construction of 2 BHK Colony in GHMC Social infrastructure:
the project within a strict time frame through a transparent
ESTABLISHMENT OF PRIORITIES: S.No. Name of the Department Infrastructure facilities provided
tendering process and the project commenced in Feb
To provide high quality affordable housing within the 2018. 1 School Education School buildings
stipulated time frame to meet the supply of high demand
The project was proposed at Kollur Village on a plot of an 2 Health, Medical & Family welfare Primary health centers / area hospitals
of housing for EWS of the society, GHMC planned the
area of 124.07 acre, in the vicinity of the Financial District department.
largest housing project of India with following strategies:
Gachibowli. The project comprises of 117 blocks having
3 Women Development & Anganwadi centers
Ÿ Assigned land of about 95 acre was acquired by 14 types of structural designs in S+9, S+10, S+11 pattern. Child Welfare Department
paying a total compensation of Rs. 30 crores by There are 15,660 flats in total, having 12 nos. of flats per 4 Civil Supplies Department. Public distribution system centers
GHMC for this mega-Housing project abutting floor in Linear & U-Shaped blocks, 13 nos.of flats per
financial district which houses major IT firms like floor in L-Shaped blocks & 16 no. of flats per floor in O- 5 Society for Elimination of Rural Dwcra buildings
Poverty (SERP), Rural Development
Amazon, Infosys, Tech-Mahindra etc. Shaped Blocks. Each flat has a carpet area of 406.9 sq ft, Department
plinth area of 470 sq ft and floor area (including common
Ÿ Land of about 29 acres was having huge burrow pits
area) of 560 sq ft. Total-built-up area is 88,23,102 sq ft 6 Collector & District Magistrate Providing Markets, burial grounds, cremation centers, plantation of tress
which were utilized for the formation of Outer Ring
(8,19,693 sq m). The project also includes development under Harithaharam.
Road. The land was reclaimed for providing parks,
of all associated infrastructure for a housing project and
{ 14 } { 15 }