better performance and seamlessly integrate such Client Requirements
energy efficiency in buildings. modelling approaches with In the present case the client
At the material level, the design process. With the was Bihar State Disaster
nano-technology has been advancement of Building Management Authority,
employed to develop building Information Modelling (BIM) Govt of Bihar. The Client
materials that can help to (Bynum et al., 2013; Volk requirement was to construct
improve the performance of et al., 2014), this will serve two types of disaster resistant
buildings such as improving as an excellent platform building –One type having
the thermal and acoustical for such integration to plinth area-41.28 sqm and the
insulation, allowing more occur. It also allows a better other type having plinth area-
daylighting through glazing integration of the different 20.64 sqm with minimum
systems but reducing the cost but aesthetic design.
entry of heat. The concept of simulation models so that a Since the site was located in
Life Cycle Analysis (Dixit et better understanding of the an earthquake prone, flood
al., 2010; Ramesh et al., 2010) relationship between these prone and cyclone prone belt
has also been introduced simulation models could be of State, expectation was to
that monitors the embodied obtained. Currently, there is use such innovative materials
body of resources utilized also lack of understanding of which were cost effective and
throughout the entire the inter-relationship between disaster resistant and eco-
building life cycle. This has urban and building systems. friendly in nature. Only six
also resulted in better control Such understanding is crucial months time was given for
of resources utilization during as studies have shown that the construction of the houses.
the design, planning and microclimates, which are very
construction of buildings. much governed by the urban Keeping in view the above
systems could have major requirements the building
CURRENT impact on the energy, thermal, was designed and constructed
CHALLENGES IN COST and lighting performance of adopting efficient design
EFFECTIVE, DISASTER buildings. Currently, there are and using innovative, cost
RESILIENT AND ECO- tremendous research works effective and eco-friendly
FRIENDLY DESIGN done at the urban level using material within 06 month.
AND CONSTRUCTION Geographical Information Hence it satisfied client
Despite the advances in the System (GIS). The study requirements.
research and development of such inter-relationship Brief Description of Project
in the building, there are still between urban and building All the 52 houses were
major challenges encountered. systems could be facilitated by constructed in Singhwara
One key challenge is in the a better integration between village of Bihar. The type-I
integration of such practices GIS and BIM. structure consisted of 26
in the design process. Most houses with plinth area of
designers still see such tasks CASE STUDY 41.28 sqm each and the type-
as the responsibilities of the Green construction of II structure with plinth area of
environmental consultants disaster resistant (earthquake 20.64 sqm each for the balance
rather than part and parcel of resistant, flood resistant 26 houses. The rectangular
their design tasks. Thus, it is & cyclone resistant), cost plan is divided in two rooms
essential that more research effective and eco-friendly of unequal area. The house
should be conducted to rural houses has an attached veranda on
April 2022 Volume 23 No. 1 - SHELTER 25