PRESENT STATUS  OF THE PROJECT


             •  An 82-kilometer-long sewerage network was developed, covering 96% of the walled city area, with sewerage house
                service connections (HSC) provided to 25,000 households.
             •  A 97-kilometer-long water supply network was established, covering 96% of the total length of the water supply network.
             •  A 236-kilometer-long duct has been laid, shifting overhead cables to underground ducts.
             •  Ninety-five kilometers of storm water drainage were developed, reducing soil erosion and ensuring a clean walled city.
             •  Eighty kilometers  of  roads  were developed, resulting  in widened roads,  decreased  traffic  congestion,  and reduced
                accidents.
             •  The initiative introduced 24/7 water supply in the walled city area, providing water house service connections (HSC) to
                19,000 households.
             •  The operational Supervisory Control and Data Acquisition (SCADA) system has lowered maintenance costs and facilitated
                prompt rectifications in water, sewerage, and power transmission lines.