QUANTIFIABLE OUTPUT OF THE PROJECT:
• Commissioned a Water Treatment Plant (WTP) with a capacity of 23.47 MLD to treat, supply, and distribute drinking water
24/7 to 20,000 households in the walled city area.
• Laid an 82-kilometer-long sewerage network, covering 96% of the walled city area, and provided sewerage house service
connections (HSC) to 25,000 households.
• Constructed 95 km of storm water drainage.
• Relayed 80 km of roads, widening them to alleviate traffic congestion and prevent accidents.
• Laid a 236-kilometer-long duct, shifting overhead cables to underground ducts.
• Commissioned the SCADA system for water supply, sewerage, and power distribution.