QUANTIFIABLE OUTPUT OF THE PROJECT:



             •  Commissioned a Water Treatment Plant (WTP) with a capacity of 23.47 MLD to treat, supply, and distribute drinking water
                24/7 to 20,000 households in the walled city area.

             •  Laid an 82-kilometer-long sewerage network, covering 96% of the walled city area, and provided sewerage house service
                connections (HSC) to 25,000 households.

             •  Constructed 95 km of storm water drainage.

             •  Relayed 80 km of roads, widening them to alleviate traffic congestion and prevent accidents.

             •  Laid a 236-kilometer-long duct, shifting overhead cables to underground ducts.
             •  Commissioned the SCADA system for water supply, sewerage, and power distribution.









































                             Water Treatment Plant (WTP)                                        Relaying of Roads






                INTEGRATED INFRASTRUCTURE PACKAGE OF ABD AREA OF UDAIPUR CITY

                                                                                                                                  |  41