              With a population of 2160       Corporation    (KMC)      has   SLUM PROFILE AND
              people and a site size of       contributed  to the process  CHARACTERISTICS
              1.09   hectares,   the   plan   of locating, identifying, and
              was    implemented      while   prioritising the distribution of   Socio- Economic
              maintaining a gross density     homes to the most vulnerable    Characteristics
              of 396 DU/hectare. The          people. For eligibility, the BPL   The typical household size
              cost of each unit was Rs 2.5    slum dwellers should have       in the settlement was five
              lakh, of which beneficiaries    stayed in the slums prior to    people (figure 3), which
              contributed 5%, or Rs 12,500.   1995. The site plan of Chetla   accounts for 40% of the
              However, those who wanted       In-situ  Resettlement  project   population. The joint family
              a ground-floor apartment or     is given at figure 2. Acquiring   arrangement    represented
              one in a preferred location had   consent was not a problem     a significant number of
              to pay more. The beneficiaries   (70%) and there was the        household    members.    The
              were required to contribute     willingness of the majority     majority of slum dwellers
              5% of the dwelling unit’s cost,   of the dwellers  to shift to a   work for a daily wage (70%)
              regardless of their income or   permanently owned pucca         or at a local store (33%), or
              financial situation. The state’s   structure. Women grantees    they   perform    household
              portion was Rs. 75,000 (30%),   received preference, and they   cleaning   activities  (28%),
              the ULB (KMC) share was Rs.     were chosen by the revenue      where majorly  women are
              44,500 (18%), and the central   department. The beneficiaries   involved (figure 4 & figure 5).
              share was Rs. 1.18 lakh (47%).   were   chosen     using    a
              The state share received low-   digitalised  lottery  method    Due to its proximity to the
              interest financing from the     in a way that automatically     city’s central business district,
              Asian Development Bank.         assigns   households    with    the community had a low-
                                              physically disabled members     income profile (figure 6). An
              PROJECT DETAILS                 on the first floor.             average family size of five
              The     Kolkata    Municipal                                    and more reduces a person’s


                  Figure 2: Site Plan of Chetla In-situ Resettlement Project

























                  Source: Compiled by Authors (Primary Survey, 2020)



                                                           October, 2022, Volume 23. No.2 - SHELTER     75