CASE STUDIES
Images 1: G+ 4 structure without Images 2: Toilet door width was Images 3: Doubly loaded dark
provision for lift not according to standard corridors
Source: Compiled by Authors (Primary Survey, 2020)
providing transit houses to 432 Figure 8: Ground foor plan showing the block details
families. The cost of the land
for projects was not provided
under the programme and
has been borne by the State
government.
Infrastructure Characteristics
Basic urban infrastructure
and services were provided
in their new flats including
in-house electric connection,
access to community toilets as
part of project design, public
water supply connection,
KMC catered for solid waste
collection, 100% provision
for drainage and access to
Anganwadi within the site.
To comprehend the pre-
and post-redevelopment
circumstances and conditions
of the slum dwellers, a
comparative analysis was
conducted (Table 1). The Source: Compiled by Author (Primary Survey, 2020)