CASE STUDIES


              Images 1: G+ 4 structure without  Images 2: Toilet door width was   Images 3: Doubly loaded dark
              provision for lift              not according to standard      corridors


























              Source: Compiled by Authors (Primary Survey, 2020)

              providing transit houses to 432   Figure 8: Ground foor plan showing the block details
              families. The cost of the land
              for projects was not provided
              under the programme and
              has been borne by the State
              government.

              Infrastructure Characteristics
              Basic urban infrastructure
              and services were provided
              in their new flats including
              in-house  electric  connection,
              access to community toilets as
              part of project design, public
              water   supply    connection,
              KMC catered for solid waste
              collection,  100%  provision
              for  drainage  and  access  to
              Anganwadi within the site.

              To comprehend  the pre-
              and      post-redevelopment
              circumstances and conditions
              of the slum dwellers, a
              comparative analysis was
              conducted  (Table 1). The       Source: Compiled by Author (Primary Survey, 2020)